Products

Cable tie tool

24 June, 2003 | Panduit International Ltd

Using pneumatic power, the PTS cable tie installation tool automatically tensions and cuts off small to medium size cable ties in a fraction of a second.

Arm/wrist brace

24 June, 2003 | AME System Pty Ltd

The Bio-Brace 2.0 helps the user manage torque reaction while preserving a range of motion.

Monitoring system for workplace hazards

24 June, 2003 | Envirorent Pty Ltd

SensorLynx is a monitoring system measuring a variety of workplace hazards with one common system. The monitor can be expanded by linking from one to ten application-specific modules via snap-on or cable (for remote monitoring).

Bump caps

24 June, 2003 | Protector Alsafe

The First Base Cap Plus looks like a normal baseball cap, but incorporates a hard protective shell made from recycled plastic. The cloth cap is made from cotton/polyester, is machine washable and can be embossed or embroidered in company logos.

Manhole access cover

24 June, 2003 | Coversafe

Coversafe Access Alert addresses the issue of manhole/confined space dangers. Sewer and stormwater manholes are the most common confined space in residential and commercial areas, and in many instances, the most easily accessible.

Gas detector

24 June, 2003 | Control Equipment Pty Ltd

The Eagle gas detector provides detection combinations with simultaneous detection of up to six different gases. The Eagle features easy access to controls such as auto calibration, alarm silence, demand zero, peak hold and a variety of other features. Each channel has two alarm levels plus TWA and STEL alarms for toxic channels. The two alarm levels are user adjustable and can be latching or self-resetting.

Remote valve operation

29 May, 2003 | Fortress Systems Pty Ltd

Fortress Systems and Smith Flow Control have announced the Flexi-Drive, a device for the remote operation of valves in hard to reach or hazardous locations.

Modular and open machine monitoring

29 May, 2003 | Rockwell Automation Australia

The Entek XM series is designed for the protection of high speed and critical-production machinery and to monitor and protect machinery against high vibration and the resultant damage caused by excessive vibration.

Store-Safe dangerous goods stores

29 May, 2003 | Store-Safe

Store-Safe's range of stores and cabinets are designed specifically for the storage of drums that can facilitate connection to continuous feed machinery.

DeviceNet emergency stops

29 May, 2003 | Micromax Pty Ltd

E-connect is the plug-and-work way to connect traditional e-stop devices and safety relay modules. E-connect DeviceNet stations operate in the background to monitor where the stop was initiated and annunciate the system status.

Disconnect device

29 May, 2003 | NHP Electrical Engineering Products Pty Ltd

The Sprecher + Schuh KT7-25-TRE disconnect device offers added safety for installations using the KTA7 motor circuit breakers.

Driver feedback signs

29 May, 2003 | Sykes Australia Ltd

Fitted with the latest 'approach-only' radar technology to quickly and accurately detect the speed of approaching vehicles, driver feedback signs provide the driver with real-time feedback as to their vehicle's speed as it approaches the sign.

RLS 100 laser scanner

29 May, 2003 | SICK Pty Ltd

With the RLS 100, Sick has introduced a safety laser scanner complying with IEC/EN61496, Type 3.

Category 4 module

29 May, 2003 | Pilz Australia Industrial Automation LP

Safety systems controlling large, complex machinery are now faster, simpler to implement and more cost-effective with the release of an input/output module from Pilz Australia.

Live power tester

29 May, 2003 | Megger Limited

Insulation power factor tests on bushings fitted to high-voltage switchgear, transformers and similar items of equipment can now be carried out rapidly, easily and safely without the need to take the equipment out of service. The tests, which give accurate information about the insulation quality, revealing such potential problems as cracks, surface contamination and incipient faults, are performed at the installation's full working voltage, and can typically be completed in under five minutes.

  • All content Copyright © 2025 Westwick-Farrow Pty Ltd