Flood containment barrier
The Beaver Flood Barrier offers protection against flooding and large spills. It consists of two flexible PVC tubes laid side by side, permanently joined to form a twin element with static stability. The product is available in varying lengths and heights.
Supported by a Hytrans 4000 L/min pump, a 1 m high x 10 m long twin-element can be ready in less than 15 minutes.
The product can be inflated with air for pre-deployment, allowing the user to wait for confirmation of a spill or flood before filling the tubes with water.
The tubes are stackable during deployment, allowing the user to stock a standard product size, and yet have the flexibility to cater for deeper or deepening containment if required.
The product is suitable for a wide variety of applications, including emergency services, construction sites and flood-prone industrial sites.
The tubular, inflatable walls have minimal restrictions regarding the underlying surface or required equipment, providing an easily deployable containment barrier within 15 minutes.
Phone: 02 9253 4990
Emerson Rosemount 3144S Temperature Transmitter
The Rosemount 3144S Temperature Transmitter is engineered to provide 0.05°C of accuracy and...
HEMCO flammable storage cabinet
The HEMCO cabinet for flammable storage is specifically designed for the storage of flammable...
Clesana C1 water-free mobile toilet
The Clesana C1 water-free mobile toilet is being introduced to Australia by national distributor...
