Flood containment barrier
The Beaver Flood Barrier offers protection against flooding and large spills. It consists of two flexible PVC tubes laid side by side, permanently joined to form a twin element with static stability. The product is available in varying lengths and heights.
Supported by a Hytrans 4000 L/min pump, a 1 m high x 10 m long twin-element can be ready in less than 15 minutes.
The product can be inflated with air for pre-deployment, allowing the user to wait for confirmation of a spill or flood before filling the tubes with water.
The tubes are stackable during deployment, allowing the user to stock a standard product size, and yet have the flexibility to cater for deeper or deepening containment if required.
The product is suitable for a wide variety of applications, including emergency services, construction sites and flood-prone industrial sites.
The tubular, inflatable walls have minimal restrictions regarding the underlying surface or required equipment, providing an easily deployable containment barrier within 15 minutes.
Phone: 02 9253 4990
Tesvolt TS HV 30–80 E battery storage systems
The TS HV 30–80 E battery storage systems will be certified by TÜV Rheinland for...
HEMCO chemical-resistant island canopy hoods
The HEMCO chemical-resistant island canopy hoods collect and exhaust vapours, heat, steam and...
DeWalt PURE500+ and EA70-PRO chemical adhesives
The DeWalt PURE500+ and EA70-PRO chemical adhesives deliver a complete anchoring and installation...