A narrow precast wall has collapsed sideways during an incident at a high-rise building construction site in Queensland.

In January 2019, a 2-tonne precast concrete wall panel fell sideways onto the floor. The panel was tall and narrow and had been placed on plastic shims (packers) and two vertical steel dowel bars.

According to a Workplace Health and Safety Queensland incident alert, two braces were attached between the inside face of the panel and the floor of the building. After the panel had been disconnected from a crane, it is understood that an attempt was being made to manipulate the bottom of the panel into its final position with Burke (pry) bars. The panel then became unstable, fell sideways and twisted before hitting the floor.

The incident alert said that the primary cause of the incident appears to be the concrete slab being out of level and the absence of shims near one of the bottom corners of the panel. It is understood that these shims were not installed prior to lifting the panel into place, as the concrete slab under this corner was uneven and not correctly formed. The two sets of shims were positioned close to the opposite corner and near the centre of the bottom edge of the panel.

When an attempt was made to manipulate the panel with Burke bars, the panel tilted and fell sideways as it was no longer held by the crane. The two attached braces were designed to prevent the panel falling forwards or backwards, by resisting wind loading, and could not prevent the panel falling sideways.

According to Workplace Health and Safety Queensland, it is important that shims are positioned under the bottom edge of a concrete wall panel so that the panels cannot tilt sideways. This issue is particularly important with panels that are tall and narrow. With these panels, the combination of a high centre of gravity and a small drop on one end can cause the panel to become unstable.

The incident alert said that in order to avoid panels falling sideways, ensure:

  • shim details, including the shim locations under the bottom edge of the erected panels, are shown on the panel erection drawings;
  • shim details have been certified by the professional engineer certifying the temporary support system for the panels;
  • panels are only to be landed on concrete that is level and undamaged;
  • only two sets of shims are placed under narrow panels;
  • shims are placed at equal distances from the panel corners;
  • the distance between shims is large enough so that the panel cannot become unstable when panels are being moved into position;
  • the panel must remain connected to the crane until after braces are installed and any manipulation of the panel (eg, with Burke bars) has been completed;
  • the maximum height of shims does not exceed 40 mm, unless otherwise specified and approved by the certifying engineer.

Image credit: ©Fotolia RAW/Dollar Photo Club

Related News

Diversity and inclusion program launched for trucking industry

Teletrac Navman and the Australian Trucking Organisation have expanded their diversity and...

Safe and sound: SafeWork SA launches hearing loss campaign

Inspectors from SafeWork SA will visit workplaces across the state as part of a six-month...

Campaign looks into security on WA construction sites

WorkSafe WA has launched a campaign to address security issues across the state's...


  • All content Copyright © 2024 Westwick-Farrow Pty Ltd